5 Advantages You Get With BIM Implementation

· BIM

BIM is essentially an intelligent model-based process that creates building model data whereby AEC professionals can design, build, and operate buildings and infrastructures more efficiently through 3D BIM modeling services.

 

BIM service providers have transformed project estimation, quality control issues, scheduling, and streamlined different processes of construction successfully and the following game-changing benefits are marked:

broken image

1. Teamwork Synchronization
 

Different stages of the BIM project involve multiple stakeholders and BIM service providers. Under such conditions, it becomes necessary to share critical information and collaborate with them from multiple source points. The information needs to get collaborated right from the design stages, where architectural, structural, and MEP designs are separate. BIM increases the accessibility of your team to review and mark up the design thereby ensuring teamwork coordination and synchronization.
 

2. Monetary Value Addition
 

IA projects need to be cost-effective because the cost might be one of the major factors that need to be under control.

Presuming that a project is going into the construction phase and there is a conflict between structure and duct found by the architects, holding the construction and redesigning that portion would be too costly. Here, the BIM-based MEP process offers a value-added design and construction project before your construction starts and you can cope up with the possible conflicts to ensure unnecessary extra cost and late project completion.
 
3. Effective Visualization Of Project

The graphical model offered by BIM displays every feature of the project effectively and clearly that has always been a limitation with conventional paper and 2D designs. BIM scores over these conventional paper and 2D design offer an absolute design that covers floor plans, elevations, and 3D modeling services. Entire design of BIM can be seen even before starting the construction and has an effective architectural visualization.
 

4. Superior Outcomes
 

A completely synchronized BIM model provides detailed information regarding every change in the project and works as a foolproof model to take care of all the conflicts during the entire project. The goal of every AEC project remains to complete the project within the budget and well in the planned time limit.

Inaccurate design information and wrong coordination in multi-discipline design usually leads to getting stuck at any stage of the project and cannot be afforded at all during an ongoing project. BIM facilitates a coordinated construction process flow and provides solutions to all conflicts in a very crisp manner.

5. Ease Of Understanding Information
 
Construction projects are huge and involve the calculated efforts of architects, engineers, drafters, and many more. Any change in a floor plan by a designer makes conflict if the other designers are using the older version of the design. Besides, if another designer changes the plumbing design that is based on an older floor plan leads to multiple difficulties to the changes made at different points.

3D BIM modeling services are intelligent and provide absolute coordination at every stage of the design and construction process flow. It is easy to understand about any change and information regarding design in the BIM Model with effective understanding and management.


Wrapping it Up!

Every business needs a fast and clean process for their workflow and when it comes to design and construction, BIM enables you to easily collaborate and coordinate with your workforce and helps you to complete your task in a scheduled time frame.

To sum it up, BIM is potentially effective and helps to increase collaboration and communication, clash detection, improved scheduling, increased outcomes, reduces costs, and mitigates risk and preconstruction visualization.